Avoid Dunwoody Club Drive Friday and Monday

Dunwoody work crews will begin repairing a damaged storm water culvert at the intersection of Dunwoody Club Drive and Brookeridge Drive 9 a.m. to 4 p.m. Friday. Work will continue 8 a.m. to 5 p.m. Saturday and 9 a.m. to 4 p.m. Monday, weather permitting.

During construction traffic will be reduced to one lane on 150 feet of roadway on Dunwoody Club Drive. Flag crews will direct traffic to ensure the safety of drivers and construction crews. Night work will not occur on this repair due to the number of residences directly adjacent to the project.

Information: construction@dunwoodyga.gov or 678-382-6850.